Show Navigation

New Sauvie Island Bridge, Oregon

The new Sauvie Island Bridge, spanning the Multnomah Channel, was opened in 2008. This tied-arch design with a 360ft (110m) span replaced the original 1950 Parker truss bridge with a 200ft (61m) main span, after cracks were discovered in 2001. Contractor: Max J Kuney Construction Company; Owner: Oregon Department of Transportation (ODOT).

Add to Cart Add to Lightbox Download
Filename
AJH_221012_1269.jpg
Copyright
© 2022 Andrew Haliburton, All Rights Reserved
Image Size
4256x2832 / 8.1MB
https://www.photoshelter.com/support/license
https://www.andrewhaliburton.com/contact
Bridge Bridge Architecture Bridge Engineering Bridge Replacement Columbia River David Evans Associates Engineering Infrastructure Investment Kuney Construction Marine Channel Marine Transport Max J Kuney Construction Multnomah Channel Multnomah County Navigation Channel New Bridge Nikon AF Nikkor 28-105mm f/3.5-4.5D Nikon D700 ODOT Oregon Oregon Bridges Oregon Department of Transportation Portland Sauvie Island Sauvie Island Bridge Structural Engineering Structure Tied Arch Tied-arch Bridge Transportation Transportation Infrastructure Truss USA Willamette River
Contained in galleries
Sauvie Island Bridge 2008 Multnomah County Oregon
The new Sauvie Island Bridge, spanning the Multnomah Channel, was opened in 2008.  This tied-arch design with a 360ft (110m) span replaced the original 1950 Parker truss bridge with a 200ft (61m) main span, after cracks were discovered in 2001.  Contractor: Max J Kuney Construction Company; Owner: Oregon Department of Transportation (ODOT).
Info
  • Facebook
  • Twitter
x

Andrew Haliburton

  • ...more Images / Search / Buy
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Buy Calendar
  • Portfolio
  • About
  • Contact