Show Navigation

Sauvie Island Bridge Replacement Span

The new Sauvie Island Bridge being delivered down the Willamette River to the construction site. The new bridge was assembled in Portland and floated down the Willamette River and Multnomah Channel, then guided into position alongside the old 1950 bridge on December 28, 2007. The new bridge was opened in 2008. Contractor: Max J Kuney Construction Company; Owner: Oregon Department of Transportation (ODOT). Portland Oregon USA.

Add to Cart Add to Lightbox Download
Filename
AJH_071228_1754.jpg
Copyright
© 2007 Andrew Haliburton, All Rights Reserved
Image Size
3264x2448 / 5.9MB
https://www.photoshelter.com/support/license
https://www.andrewhaliburton.com/contact
Bridge Bridge Architecture Bridge Engineering Bridge Replacement Columbia River Construction David Evans Associates Engineering Fabricate Float Infrastructure Investment Kuney Construction Marine Channel Marine Transport Max J Kuney Construction Multnomah Channel Multnomah County Navigation Channel New Bridge ODOT Old Bridge Oregon Oregon Bridges Oregon Department of Transportation Portland Sauvie Island Sauvie Island Bridge Structural Engineering Structure Tied Arch Tied-arch Bridge Transportation Transportation Infrastructure Truss USA Willamette River
Contained in galleries
Bridges, Sauvie Island Bridge 2008 Multnomah County Oregon
The new Sauvie Island Bridge being delivered down the Willamette River to the construction site. The new bridge was assembled in Portland and floated down the Willamette River and Multnomah Channel, then guided into position alongside the old 1950 bridge on December 28, 2007. The new bridge was opened in 2008. Contractor: Max J Kuney Construction Company; Owner: Oregon Department of Transportation (ODOT). Portland Oregon USA.
Info
  • Facebook
  • Twitter
x

Andrew Haliburton

  • ...more Images / Search / Buy
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Buy Calendar
  • Portfolio
  • About
  • Contact