Show Navigation

FEC New River Bridge Normal Open Position

FEC New River Bridge (1978) is a single-leaf bascule railroad bridge spanning the navigable New River in downtown Fort Lauderdale. The design type is a through plate girder bridge of total span 70 feet /21.3m, providing a horizontal boat navigable clearance of 60 feet/18.3m. Additionally, the bridge comprises three 25-foot approach spans, plus a 14-foot machinery room span, from the north; and two 25-foot spans from the south. Notable was the use of weathering steel to eliminate environmental concerns around initial and future painting. By 1985, the weathering steel had reportedly reached a stable condition for its environment. One of the design criteria for this bridge was to double-track the crossing, removing the bottleneck of a single track bridge at this location dating back to 1912. Now, in the 21st Century, as freight trains are once again sharing the tracks with passenger trains operated by Brightline, alternatives are being studied through the New River Crossing Feasibility Study to further expand capacity by tunnel and various fixed/movable bridge replacement options. Owner: Florida East Coast Railway Company (FEC). Engineer: Greiner Engineering Sciences Inc. General Contractor: Powell Brothers Inc. Broward County, Florida, USA.

Add to Cart Add to Lightbox Download
Filename
AJH_230125_2232.jpg
Copyright
© 2023 Andrew Haliburton, All Rights Reserved
Image Size
4216x2806 / 8.7MB
https://www.photoshelter.com/support/license
https://www.andrewhaliburton.com/contact
Bascule Bridge Bridge Bridge Architecture Bridge Engineering Brightline Broward County City Skyline Corten Steel COR-TEN steel Downtown Drawbridge Engineering FEC New River Bridge Florida Florida Department of Transportation Florida East Coast Railroad Bridge Florida East Coast Railway Florida East Coast Railway Company Fort Lauderdale Greiner Engineering Sciences Inc. Heavy Rail Transit Hinged Bridge Infrastructure Investment Infrastructure Reuse Low Clearance Bridge Marine Channel Movable Bridge Moveable Bridge Navigable River Navigation Channel Navigation Lights Night Photography Night View Powell Brothers Inc. Railroad Bridge Structural Engineering Through Plate Girder Bridge Transportation Transportation Infrastructure Urban Landscape USA Waterfront Weathering Steel
Contained in galleries
FEC New River Bridge 1978 Broward County Florida
FEC New River Bridge (1978) is a single-leaf bascule railroad bridge spanning the navigable New River in downtown Fort Lauderdale. The design type is a through plate girder bridge of total span 70 feet /21.3m, providing a horizontal boat navigable clearance of 60 feet/18.3m. Additionally, the bridge comprises three 25-foot approach spans, plus a 14-foot machinery room span, from the north; and two 25-foot spans from the south. Notable was the use of weathering steel to eliminate environmental concerns around initial and future painting. By 1985, the weathering steel had reportedly reached a stable condition for its environment. One of the design criteria for this bridge was to double-track the crossing, removing the bottleneck of a single track bridge at this location dating back to 1912. Now, in the 21st Century, as freight trains are once again sharing the tracks with passenger trains operated by Brightline, alternatives are being studied through the New River Crossing Feasibility Study to further expand capacity by tunnel and various fixed/movable bridge replacement options. Owner: Florida East Coast Railway Company (FEC). Engineer: Greiner Engineering Sciences Inc. General Contractor: Powell Brothers Inc. Broward County, Florida, USA.
Info
  • Facebook
  • Twitter
x

Andrew Haliburton

  • ...more Images / Search / Buy
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Buy Calendar
  • Portfolio
  • About
  • Contact